US 380 Projects

Construction Updates:

For up-to-date construction, visit www.DriveTexas.org.  You can toggle between current conditions and future conditions utilizing the map legend box.

There are currently two US 380 main projects the Texas Department of Transportation (TxDOT) is managing.  One is the US 380 Interim Grade Separation Construction Project for the widening of US 380 scheduled to start in early 2022 identified as Project 0135-10-050.  The second is the US 380 Denton County Feasibility Study that runs from I-35 to the Collin County line (Project Nos. 0135-10-061, 0135-10-062, 2250-02-022).

The purposed of the US 380 Denton County Feasibility Study (2045) is to analyze potential alternative alignments for a limited access facility, including the existing alignment and new alignments, for US 380 & SL 288 from I-35 to Collin County line within Denton County.  This study assumes that the planned grade separated improvements from the US 380 from Loop 288 to West of CR 26 project to be considered as the No-Build (do nothing) scenario.

Information on the US 380 Denton County Feasibility Study is available on TxDOT's website.  Individuals can sign up to receive project updates from TxDOT.

380 Interim Grade Project           2045 Feasibility Study

 

 

Contacts

NameJurisdictionTitleAddressPhone Number
The Honorable Jared Patterson

State Representative

District 106

Office E2.716, PO Box 2910, Austin, TX 78768-2910

512-463-0694

The Honorable Ryan Williams

Denton County

Commissioner Precinct 1

1175 Union Hill Road
Sanger, TX 76266-8501

940-349-2810
972-434-8804

Stephen Endres

TxDOT

Project Manager (Feasibility Study)

4777 East US Hwy 80, Mesquite, TX 75150-6643

214-320-4469

Travis Campbell

TxDOT

Project Manager (Construction Project)

2624 W. Prairie, Denton, TX 76201

940-387-1414