US 380 Feasibility Study (2045)

US 380 Feasibility Study

The US 380 Denton County Feasibility Study runs from I-35 to the Collin County line (Project Nos. 0135-10-061, 0135-10-062, 2250-02-022).

The purposed of the US 380 Denton County Feasibility Study (2045) is to analyze potential alternative alignments for a limited access facility, including the existing alignment and new alignments, for US 380 & SL 288 from I-35 to Collin County line within Denton County.  This study assumes that the planned grade separated improvements from the US 380 from Loop 288 to West of CR 26 project to be considered as the No-Build (do nothing) scenario.

Information on the US 380 Denton County Feasibility Study is available on TxDOT's website.  Individuals can sign up to receive project updates from TxDOT.

US 380 Feasibility Study Public Meetings